Re-Sign System is
currently down.
All Book 1
will be automatically
Re-signed
Book 1 - 702
Book 2 - 9
---Book 2 Call out immediately following Book 1 call out (if any jobs are available) ALL Book 2 must have a current Travel Letter from their Business Manager to take a job and a PAPER COPY paid up dues receipt. We do not accept pictures on phones, emails or faxes of dues receipts. NO EXCEPTIONS! (No referrals after 2:30pm , due to WorkRight not taking any applicants after 2:45pm)
We regret to inform that Brother Mark Range has passed away. No details for his service. Please keep the Range family in your prayers.
220 South Hull St, Athens Ga (Springhill Suites)
-The Rome Unit meeting will be held on the 2nd Tuesday of each month
- The Columbus Unit Meeting is the 2nd Tuesday of every month
All powerhouse calls must have OSHA 10, a non laminated SS card and an observed drug screen.
WorkRight:
Allison-Smith, 1Electric, Action Electric, Allied Electric, BCD, Bridges Elec , B&O Elec , BBH, Buffington-Burns, Cleveland, D&D, D&R, Dixie, Escoe, Hewatt, JM Clayton, Knox, Lawson, MacLean-Riggins, McMichen, Mayberry, Menard, M.E Contractors, Miller TN, MMHB, MWI, Partitions, Performance, Pirkle, Precision, Sutton, Telco, The Superior Group, TLS, Uptime, United, Unity, Vulcan, White Elec, Wiman-Griffie, Whitehead, Womack
Caduceus
Inglett & Stubbs
AnyLab Test Now
Vantix
LabCORP
TA Services
Aldridge, Miller Fla, Lawson, Sachs, F.S Scarbrough, Intellipsring Technologies and C&C does their own Drug testing
Indefinite call working 5-8's with possible OT Mon-Fri starting at 6am
Background check required - TAKES 72 HOURS MINIMUM ---(UNPAID)
Job will be ending 5/9/25
Job Steward: Thomas Davis
Apr 25, 2025Indefinite call working 5-8's Mon-Fri starting at 6am
Switch Data Center
--Hire in days for UpTime are Mondays & Thursdays only--
Apr 25, 2025Indefinite Welder call working 5-8's Mon-Fri starting at 6am
This position is at Clevelands FabShop in Austell.
Welding evaluation will be given
Apr 25, 2025Indefinite call working 4-10's Mon-Fri starting at 7am
Cartersville Water Treatment Plant - Heavy Industrial Work
Apr 25, 2025Indefinite call working 6-10's Mon-Sat starting at 6:30am
Project Blackwell Data Center
Drug test at WorkRight on Friday 4/25 after call-out.
Report to Project Blackwell jobsite Monday morning 4/28 (NO LATER THAN 6:30am) for hire in orientation
Job Address: 2005 Marietta Rd NW, Atlanta GA 30318
Apr 25, 2025